Profile
Engineer with a Master's Degree, with ample experience in Cost Control of all trades (Civil, MEP, and Finishing) - Project Planning/scheduling, Risk Analysis, and Resource Optimization, Estimation/Costing, utilizing tools like Primavera (P3/P6)/ MS Project (for Scheduling), Primavera Risk Analysis/@Risk/ Frontline's Risk Solver (for Risk Analysis), IBM CPLEX ILOG/Microsoft Solver Foundation/Frontline's Solver (for Optimization).
In project Planning, I possess advance skills in setting up and monitoring of EPCC projects. Exceptional in preparation of PERT/CPM, bar chart, manpower/resource loading, "S" curve and cash flow planning, and delay impact analysis. On cost control/Resource Allocation, development of cost, time, and resources estimates (CTR).
On Forensic Scheduling (Based on AACE IRP #29R-03 - when appropriate), I can analyze schedule slippage; prepare delay analysis report and preparation of catch up/recovery schedule. In Risk Analysis and Optimization - (Based on AACE IRP #41R-08, AACE IRP #42R-08, AACE IRP #44R-08 and AACE IRP #65R-11 - when appropriate), experience in developing Risk models and Duration Uncertainties, experience in probabilistic schedule & Cost Risk Analysis, Generating of Contingency Rundown Curve, Burn down Chart, and Sensitivity analysis Report.
On Estimation, Possess outstanding skill in conceptual cost Analysis and Estimation/Developing Estimation Basis, Elemental Format Estimate (classes B, C, D), Lump sum, Unit rate and cost plus Estimation, Productivity Analysis of Cost Estimates, Estimation analytics (Cost and Quantities Comparisons).
I am familiar with standards/recommended practices, particular to Engineering design, construction/fabrication, welding, material selection, surface preparation, and inspection. Standard and Recommended Practices Like: ASME VII DIV. IX, API 1104, API 5L8, API P571, API RP 580 RBI, and API RD 579 FF service level one to ASME IX, API 570, AWS D1.1,NACE RP0494, SIS, SSPC, ISO/TS 29001:2010, ASTM E337 AND ASTM D 3925, DNV-OSS-102, DNV-OS-C401, DNV-RP-B101, API 2FPS. Conversant with Classification Rules/Standard particular, but not limited to BV, ABS, Lloyds, and DNV - GL.
Professional Experience
Senior Project Control Specialist
2018 - Present- Nigerian Project Organization – Offshore Projects – Undertake detail project analysis of all Offshore projects – Cost Estimates, Risks, Planning and Readiness – Contractor.
- Prepare integrated Level III schedule for all offshore project for weekly update to project managers Update.
- Provide daily reports on all ongoing project and status.
- Provide Line managers with forecast and trends on all ongoing project.
- Liaise with discipline line managers on Resource loading, as input into POB projection Histogram. Update the Resource Burn Down Histogram/Chart for the Weekly stakeholders Briefing.
Senior Planning Engineer
2017 - 2018- On Exxon Mobil’s Usari ADP Project - FEED, I liaise with the discipline engineers to develop a detail CTR for the project.
- Prepared a functional fully resourced schedule for the project. Prepare the Weekly report, forecast and look heads for the project.
- On Belema oil’s Robertkiri Gas Development Project – FEED/DED – Develop a fully Resourced Schedule for the project.
Lead Planning Engineer
2016 - 2017- Developed detailed resourced loaded schedule for all structural steel, U/G Piping and Trading Facility works of the Project.
- Oversee the reporting and monitoring of the project in line with management Target objective. Present Forecast and scenarios to intimate management of health status.
- Produced and update forecast manpower histogram for input to the yard manning forecast.
- Liaise with client and line managers in producing planning procedures like Project Scheduling Procedures, Work Breakdown Procedures, and Physical Progress Measurement Procedures.
Senior Planning Engineer
2014 - 2016- On ABO FPSO LE Project, developed the Detail/Functional project schedule with CTR's as the basis.
- Liaise with discipline Engineers in resource loading for approved CTR, Liaise with Discipline Heads, and Project Manager in developing the yearly budget.
- Create the CC (Class Condition) Schedule, and harmonizing the schedule with the Working Project Schedule to enable the vessel Meet Class Condition Obligation.
- Collate and Update the Monthly and the Weekly Report, Aligning Sub-Contractors Schedule and progress measuring system to BW's progress measuring system and Client's project objectives.
- Prepare functional P10, P65, and P90 Schedules for client with corresponding "S" Curves, and providing monthly updates on the schedule and curves.
- Liaise with the project controls manager in preparation/updating of contingency Rundown curve. Provide inputs, like project schedule scenarios, based on identified Risk as back up for contingency cost estimate to the Annual Project Budget Estimate.
Senior Planning Engineer
2011 - 2014- On Total’s Ofon Phase II Project, Prepare the functional project schedule for the projects, from concept to commissioning (with primavera P6/Ms project up to level 5 i.e. equipment level).
- Prepare delay analysis and implementation of crash/overlapping schedules for timely completion of projects.
- Update schedule with physical progress and man-hour expenditure to show all trends, status, forecast and scenarios. Generate ad-hoc schedules and reports as required.
- Produced and update forecast manpower histogram for input to the yard manning forecast. Liaise with client and line managers in producing planning procedures.
Planning Engineer/Estimator
2009 - 2011- On EGPA 3A and TIP projects, Prepare the overall fabrication project schedule, and cost estimation for additional fabrication scope.
- Forecast Manning level base on projected deliverables. Update schedule with physical progress and man-hour expenditure to show all trends, status, forecast and scenarios.
- Produced and update forecast manpower histogram for input to the yard manning forecast.
- Prepared elemental format Estimate (classes B, C, D). Estimate Labor and Material cost on all fabrication Projects, Review and Analysis complex Bills of Materials.
Planning Engineer
2002 - 2008- Facilitate maintenance work order process, track maintenance Budget through ides, for planned and actual reporting.
- Perform capacity leveling schedule for work base on available capacity using IPES.
- Update instrument design data using INTOOLS in IPES, update built drawing on IPES using BUILTDOC.
- Update inspection data on IPES using the inspection data tool, calculate KPI's, and perform general cost reporting.